Toibox Buildings . . .
"Because grown-up toys cost so much more, they need a grown-up toy box."
toibox.jpg (21007 bytes)You'll probably replace your toys a couple of times before you'll ever need to think about a new TOIBOX building.   No other building can match the TOIBOX in versatiliy, quality, and cost-effectiveness. 

There are many advantages in cost and construction when purchasing a TOIBOX building. Rugged, reslient steel construction will take the bumps and bangs common to a working building and will require virtually no annual maintenance. 

TOIBOX buildings can be purchased in a variety of colors and sizes.  In as few as 10 working days the complete TOIBOX package can be on site and ready for assembly. 

For more information pertaining to TOIBOX steel structures visit any of the links below:

abs-logo.JPG (8773 bytes)
Phone: (574) 936-5922
Fax: (574) 936-4437

 
abs.mail@earthlink.net


About ABS | Products | Projects | Materials | Toibox Buildings | Specials | Residential Roofing |Grating | Stock Deck  | Inventory Reduction | Customer Service | Technology | Design Work |American Stair  | Surplus Office Equipment |Contact Us